| Sign In | Join Free | My himfr.com |
|
| Ask Lasest Price | |
| Brand Name : | LionRock |
| Model Number : | All-in-one combined 40ft |
| Payment Terms : | TT |
| Price : | negotiate |
| Delivery Time : | negotiate |
Combined 40ft All-in-one Prefabricated Data Center
Power Module1
The power module is a single ISO40HC container with four levels of
power capacity that can be upgraded from the basic configuration to
480kW ICT load capacity in steps of 120kW each. Internal
arrangement has been designed to allow the upgrade by installing
additional power
equipment. Multiple Power Modules can be combined to support even
high ICT load.
ICT Module1
Two ICT module designs are available to suit different cabinet
depth. They can be combined in different configurations to meet
various
operation requirements. Expansion is easy just by adding more
modules. Combined with the Power module, there is always a
configuration
that meet your requirement.

General Specifications
| Fire Protection | Type | Automatic fire detection (smoke and heat) with gas suppression system (HFC-227ea) |
| Monitoring and Management | Access Control | Electronic lock with IC card reader |
| Monitoring | Video: Infrared IP cameras Data: PDF, UPS, DC, A/C, Temp & Hum, fire protection, access control and ventilation | |
| HMI | Touch screen | |
| Remote Access | Web, App | |
| Notification | SMS, email | |
| DCIM | OwlEye | |
| Structure | Container Dimensions (W x D x H): mm | 12192 x 2438 x 2896 (ISO40HC) |
| Container Weight (Fully Equipped): T | <25 | |
| Protection Level | IP552 | |
| Environmental Conditions | Working / Storage Temperature: °C | -20 to 453 / -40 to 70 |
| Humidity: % | 5 to 95 | |
| Altitude: m | ≤4000 (derating start >1000) | |
| Corrosion | Class C (500m away from seashore) |
Notes:
1 - Consult 3Tech for customized versions with Tier 3 reliability level or different ICT design load.
2 - Optional IP65 protection level.
3 - Optional maximum temperature up to 55°C.
|
| Company Info. |
| 3tech corporate limited |
| View Contact Details |
| Product List |