Home Products Remote Metering Solutions

Remote Metering Solutions

Showing 4 Products

LoRa Wireless Smart Water Meter with 0.01-50 m³/h Flow Range and ±0.5% Accuracy for Remote Reading Systems

Advanced LoRa wireless smart water meter featuring remote reading LCD display, 0.01-50 m³/h flow range, and ±0.5% accuracy. Provides 15-minute data transmission intervals, 10-year data storage, and compatibility with smart home systems. Ideal for efficient utility management with battery or external power options.

Price: $30~100usd MOQ: Negotiable Delivery Time: 1~2weeks

NB-IoT Smart Water Meter 0.01-25m³/h Flow Rate with LoRaWAN Communication and Remote Reading Capability

Advanced NB-IoT smart water meter with 0.01-25m³/h flow range and ±2% accuracy. Features LoRaWAN wireless communication, 1-year data storage, and battery power for remote reading applications. Ideal for large-scale deployments with real-time monitoring and low maintenance requirements.

Price: $30~100usd MOQ: Negotiable Delivery Time: 1~2weeks

Customizable Wired Networking Remote Meter Reading System with RS485 Bus and Real-Time Monitoring

Advanced AMR system featuring customizable configurations, RS485 bus compatibility, and real-time energy monitoring. Supports multiple meter types with enterprise-grade security and automated data collection. Provides comprehensive remote management capabilities for industrial and commercial applications with significant cost savings through energy optimization.

Price: $30~100usd MOQ: Negotiable Delivery Time: 1~2weeks

AMR Intelligent Meter Reading System with RS485 Bus Interface for Automated Utility Data Collection

Complete AMR intelligent meter reading system featuring RS485 bus connectivity, regional concentrators, isolation repeaters, and intelligent data collectors. This wired network solution simplifies operations and enables true remote meter reading for electricity, water, and gas utilities with reliable bus-based architecture and centralized management software.

Price: $30~100usd MOQ: Negotiable Delivery Time: 1~2weeks