Verified Supplier
Hunan Liangming Metal Material Co., Ltd.
HUNAN LIANGMING METAL MATERIAL CO.,LTD was founded in 2009,which is a professional manufacturer and exporter of scaffolding material and construction.
2009
Established
100~200
Employees
$10000000-50000000
Annual Sales
Manufacturer, Distributor/Wholesaler, Exporter, Seller
Business Type
Manufacturer, Distributor/Wholesaler, Exporter, Seller
Business Type
China
Country
2009
Established
100~200
Employees
10000000-50000000
Annual Sales
Top Score
View All
Hot Products
Video
Scaffolding Double Couplers BS1139
Video
BS1139 Galvanized Scaffolding Pipe 48.3mm / 60.3mm OD 1.8mm - 4.0mm Thickness
Q235B Scaffolding Spigot Joint Pin AS 1576.3 Standard Scaffolding Coupling Pins
HDG Carbon Steel Scaffolding Staircase Q235 Scaffolding Steel Ladder With Hooks
Light Duty Adjustable Steel Scaffolding Prop For Concrete Formwork Supporting
Q195 Q235 Scaffolding Catwalk With Hook Galvanized Steel Plank Customized
Silver Scaffolding Spare Parts coupler Types Corrosion Resistant For Construction
Video
48.3mm / 60.3mm OD Galvanised Scaffold Tube BS1139 Standard
Hot Dip Galvanized Scaffolding Staircase Scaffold Ringlock Ladder Q235
Honk On Steel Scaffold Boards 420*45mm Metal Scaffolding Catwalk
Japanese Pressed Scaffolding Double Couplers Joint Pin Coupler 0.65kg JIS standard
0
Scaffolding Spare Parts
View AllLight Duty Adjustable Steel Scaffolding Prop 800-5000mm for Concrete Formwork Support
Price: US $5.5 ~12.30 /PC
MOQ: 1000
Delivery Time: 20~30days after receive the L/C or deposit
Liangming Drop Forged Swivel Coupler 1.05kg Steel Scaffolding Spare Parts Silver
Price: 0.95-1.15USD/pc
MOQ: One 20 feet container
Delivery Time: 15-30 days
Heavy Duty Steel Scaffolding Spare Parts Hot Dip Galvanized 1.05kg
Price: 0.95-1.15USD/pc
MOQ: One 20 feet container
Delivery Time: 15-30 days
Hot Dip Galvanized Scaffolding Spare Parts 1.05kg Fixed Clamp Drop Forged Double Coupler
Price: 0.95-1.15USD/pc
MOQ: One 20 feet container
Delivery Time: 15-30 days
Carbon Steel Formwork Tie Rod Washer Plate 100x100mm 120x120mm Scaffolding Spare Parts
Price: US $0.3 ~2.30 /PC
MOQ: 1000
Delivery Time: 20~30days after receive the L/C or deposit
D12 D15 D20 Concrete Wall Formwork Tie Rod System Galvanized Surface 70kn-260kn
Price: US $0.8 ~3.30 /PC
MOQ: 1000
Delivery Time: 20~30days after receive the L/C or deposit
Ductile Iron Formwork Wing Nut D15 D20 180KN Scaffolding Spare Parts Casting
Price: US $0.3 ~1.30 /PC
MOQ: 1000
Delivery Time: 20~30days after receive the L/C or deposit
Carbon Steel Formwork Tie Rod Water Stopper 180KN Breaking Load D15 D20
Price: US $0.3 ~2.30 /PC
MOQ: 1000
Delivery Time: 20~30days after receive the L/C or deposit
Scaffolding Metal Planks
View AllGalvanized Steel Scaffolding Catwalk Plank with Hook 210mm Width 1829mm Length Custom
Price: US $6.10 ~10.15 /PCS
MOQ: 1000 Piece/Pieces
Delivery Time: 5-30 days
Galvanized Steel Scaffold Board 420x45mm with Hook for Construction Walkway
Price: US $6.10 ~10.15 /PCS
MOQ: 1000 Piece/Pieces
Delivery Time: 5-30 days
Pre Galvanized Metal Plank Scaffolding Catwalk 250x50mm with Hook 1000-4000mm
Price: US $6.10 ~10.15 /PCS
MOQ: 1000 Piece/Pieces
Delivery Time: 5-30 days
Galvanized Metal Catwalk Scaffolding Board 240x45mm with Hook BS1139 EN12811
Price: US $6.10 ~10.15 /PCS
MOQ: 1000 Piece/Pieces
Delivery Time: 5-30 days
225x38mm Corrode Resistant Steel Scaffold Plank Board 1-4m Length EN 12810
Price: US $6.10 ~10.15 /PCS
MOQ: 1000 Piece/Pieces
Delivery Time: 5-30 days
Q195 Q235 Scaffolding Metal Planks 250x40mm BS1139 Steel Plank 1.0-1.2mm
Price: US $1.69 ~16.89 /Piece
MOQ: One container
Delivery Time: 15-30 days
Galvanized Scaffolding Metal Planks 210x45mm Catwalk with Hook Custom Lengths 1-4m
Price: US $6.10 ~10.15 /PCS
MOQ: 1000 Piece/Pieces
Delivery Time: 5-30 days
BS1139 250x50mm Hot Dipped Galvanized Scaffolding Planks 1.0-1.2mm Thickness
Price: US $1.69 ~16.89 /Piece
MOQ: One container
Delivery Time: 15-30 days
Scaffolding Double Couplers
View AllDrop Forged Scaffolding Double Coupler BS1139 48.3mm 0.98kg Hot Dipped Galvanized
Price: US $1.10 ~12.65 /PCS
MOQ: 10000 Piece/Pieces
Delivery Time: 5-30 days
JIS Standard Pressed Scaffolding Double Coupler Joint Pin 48.6mm 0.65kg Electro Galvanized
Price: US $0.85 ~1.85 /PCS
MOQ: 10000 Piece/Pieces
Delivery Time: 5-30 days
Electro Galvanized Scaffolding Ladder Clamp Pressed EN74 BS1139 48.3mm 0.5kg
Price: US $0.5 ~1.25 /PCS
MOQ: 10000 Piece/Pieces
Delivery Time: 5-30 days
Steel Scaffolding Double Coupler 48.6mm JIS Q235B Electro Galvanized 3mm Thick 0.6kg
Price: US $0.5 ~0.85 /PCS
MOQ: 10000 Piece/Pieces
Delivery Time: 5-30 days
Electro Galvanized Pressed Double Coupler JIS Standard 48.6mm 0.6kg for Scaffolding
Price: US $0.5 ~0.85 /PCS
MOQ: 10000 Piece/Pieces
Delivery Time: 5-30 days
Electro Galvanized Double Swivel Coupler 48.6x60.5mm JIS Standard 0.65kg
Price: US $0.5 ~0.85 /PCS
MOQ: 10000 Piece/Pieces
Delivery Time: 5-30 days
JIS Standard 48.6x60.5mm Pressed Steel Double Coupler Q235B Electro Galvanized 0.65kg
Price: US $0.5 ~0.85 /PCS
MOQ: 10000 Piece/Pieces
Delivery Time: 5-30 days
Q235B Pressed Beam Clamp for Scaffolding Electro Galvanized 48.6mm 0.98kg
Price: US $1.15 ~1.85 /PCS
MOQ: 10000 Piece/Pieces
Delivery Time: 5-30 days
Quality Assured
View All
Certifications
MILL TEST CERTIFICATE
CERTIFICATE OF REGISTRATION
SGS TEST REPORT
SGS TEST REPORT