Home Products Tunnel Formwork System

Tunnel Formwork System

Showing 23 Products

OEM Metal Tunnel Formwork System with H20 timber beam , Tunnel Lining Trolley

OEM Metal Tunnel Formwork System with H20 timber beam , Tunnel Lining Trolley Quick Details Accessories: Main Beam/Cross Props/Sub-Beam/Base Jack/Coupler Surface Treatment: Electroplated Galvanized Technique: High Frequency Welding Working Load: 3-4 tons Size: Adjustable System/Suit For Projects Usage: Construction Shuttering Support Feature: Construction Steel Tunnel Formwork Concrete Formwork Building System: All Right Steel Scaffolding System: All Right Specifications 1

Price: Negotiable MOQ: Negotiable Delivery Time: Negotiable

High Load Bearing Tunnel Formwork System For Windbreak Open Cut Tunnel

tunnel form work tunnel form system aluminium formwork system High Load Bearing Tunnel Formwork System For Windbreak Open Cut Tunnel Description: 1. Brief introduction The automatic hydraulic tunnel formwork is the equipment to make the concrete lining for the tunnel in one time. The motor gearbox is adopted to drive the whole equipment, the formwork is fully hydraulic, with hydraulic cylinder to prop & strip, and lock mechanically.         Lining formwork for windbreak open

Price: Negotiable MOQ: Negotiable Delivery Time: Negotiable

6' * 19" Scaffold / Galvanized Aluminum Scaffold Plank With Hook For Formwork System

6' * 19" Scaffold / Galvanized Aluminum Scaffold Plank With Hook For Formwork System Product Detail Aluminum plank stair treads are non-sparking, slip and corrosion resistant. They can be furnished from any style of heavy duty aluminum plank grating. It is commonly used in sewage and water treatment plants for walkways and platforms. Punched plank products offer excellent air circulation desirable for refrigeration floors and ceilings, as well as marine cargo holding systems.

Price: Negotiable MOQ: Negotiable Delivery Time: Negotiable

Durable Professional 100 * 100 * 600mm Steel Formwork For Highways , Railways , Bridges , Tunnels

Durable Professional 100 * 100 * 600mm Steel Formwork For Highways , Railways , Bridges , Tunnels Product detail: Steel formwork are engaged in development and manufacturing of the special type steel formwork for highways, railways, bridges, tunnels, walls, docks, reservoirs, large-scale stadiums, exhibition centers, etc. Specifications: 300 x 1,500 x 55, 300 x 1,200 x 55, 300 x 900 x 55, 300 x 600 x 55, 250 x 1,500 x 55, 250 x 1,200 x 55, 250 x 900 x 55, 250 x 600 x 55, 100

Price: Negotiable MOQ: Negotiable Delivery Time: Negotiable

Automatic Hydraulic Full Steel Trolley Tunnel Formwork System

tunnel form work tunnel form system aluminium formwork system Automatic Hydraulic Full Steel Tunnel Trolley Formwork System Description: 1. Brief introduction The automatic hydraulic tunnel formwork is the equipment to make the concrete lining for the tunnel in one time. The motor gearbox is adopted to drive the whole equipment, the formwork is fully hydraulic, with hydraulic cylinder to prop & strip, and lock mechanically.         Lining formwork for windbreak open cut

Price: Negotiable MOQ: Negotiable Delivery Time: Negotiable

250 * 900 * 55 , 250 * 600 * 55 Steel Concrete Formwork For Bridges , Tunnels , Walls , Docks

250 * 900 * 55 , 250 * 600 * 55 Steel Concrete Formwork For Bridges , Tunnels , Walls , Docks Product detail: Steel formwork are engaged in development and manufacturing of the special type steel formwork for highways, railways, bridges, tunnels, walls, docks, reservoirs, large-scale stadiums, exhibition centers, etc. Specifications: 300 x 1,500 x 55, 300 x 1,200 x 55, 300 x 900 x 55, 300 x 600 x 55, 250 x 1,500 x 55, 250 x 1,200 x 55, 250 x 900 x 55, 250 x 600 x 55, 100 x

Price: Negotiable MOQ: Negotiable Delivery Time: Negotiable

low labor strengh Automatic Hydraulic climbing Tunnel formwork for buildings in construction

low labor strengh Automatic Hydraulic climbing Tunnel formwork for buildings in construction 1.simple structure,easy operation,light weight 2.low labor strengh,strong adaptability, low cost 3.great equality ,stability The Automatic Hydraulic climbing formwork According to many years of its manufecture experiences,Sanbo designed SPM-50 automatic hydraulic climbing formwork for end-wall,staircase and elevator shaft. The concept of automatic hydraulic climbing formwork is

Price: Negotiable MOQ: Negotiable Delivery Time: Negotiable

Permanent Tunnel Formwork System / Tunnel Lining Trolley

tunnel form work tunnel form system aluminium formwork system Permanent Tunnel Trolley Formwork System / Tunnel Lining Trolley Description: 1. Brief introduction The automatic hydraulic tunnel formwork is the equipment to make the concrete lining for the tunnel in one time. The motor gearbox is adopted to drive the whole equipment, the formwork is fully hydraulic, with hydraulic cylinder to prop & strip, and lock mechanically.         Lining formwork for windbreak open cut

Price: Negotiable MOQ: Negotiable Delivery Time: Negotiable

Professional 300 * 1 , 200 * 55 0.27㎡ 0.18㎡ Steel Formwork For Bridges , Tunnels , Walls

Professional 300 * 1 , 200 * 55 0.27㎡ 0.18㎡ Steel Formwork For Bridges , Tunnels , Walls Specifications: 300 x 1,500 x 55, 300 x 1,200 x 55, 300 x 900 x 55, 300 x 600 x 55, 250 x 1,500 x 55, 250 x 1,200 x 55, 250 x 900 x 55, 250 x 600 x 55, 100 x 100 x 1,500, 100 x 100 x 1,200, 100 x 100 x 900, and 100 x 100 x 600mm Area/pc(m2): 0.45, 0.36, 0.27, 0.18, 0.375, 0.30, 0.225, 0.15, 0.30, 0.24, 0.18, 0.12 Weight(kg): 17.99, 14.98, 11.86, 8.68, 15.60, 13.80, 10.46, 7.87, 15.40, 12

Price: Negotiable MOQ: Negotiable Delivery Time: Negotiable

Safe Single - Side Climbing System / Climbing Formwork For Dams , Cooling Towers

Recycling Timber beam Formwork Waterproof Formwork Safe Single - Side Climbing System / Climbing Formwork For Wall Description: With CMAX SCB180 climbing systems, the loads from the fresh concrete pressure are transferred through the brackets by means of V-strongbacks and compression braces into the scaffold anchors. Typical applications for the SCB 180 system are dams, locks, cooling towers, pier heads, tunnels, and bank vaults. The formwork is simply tilted backwards when

Price: Negotiable MOQ: Negotiable Delivery Time: Negotiable

Tunnel Formwork / Aluminium Formwork System For Housing Building

permanent formwork insulated concrete formwork shuttering and formwork Tunnel Formwork / Aluminium Formwork System For Housing Building Description: Brief introduction A compositional steel formwork system mainly used in the building which has regular structure without beams, the excellent formwork system can make the integral pouring for the wall & slab be easily achieved. Competitive advantage ①. No assembling, easy operation with formed formwork. The formwork is formed

Price: Negotiable MOQ: Negotiable Delivery Time: Negotiable

Lining Formwork, Tunnel Formwork System With Hydraulic Cylinder

tunnel form work tunnel form system aluminium formwork system Lining Formwork, Tunnel Trolley Formwork System With Hydraulic Cylinder Description: 1. Brief introduction The automatic hydraulic tunnel formwork is the equipment to make the concrete lining for the tunnel in one time. The motor gearbox is adopted to drive the whole equipment, the formwork is fully hydraulic, with hydraulic cylinder to prop & strip, and lock mechanically.         Lining formwork for windbreak open

Price: Negotiable MOQ: Negotiable Delivery Time: Negotiable

High-speed Tunnel Formwork System For Windbreak Open Cut Tunnel

tunnel form work tunnel form system aluminium formwork system High-speed Tunnel Trolley Formwork System For Windbreak Open Cut Tunnel Description: 1. Brief introduction The automatic hydraulic tunnel formwork is the equipment to make the concrete lining for the tunnel in one time. The motor gearbox is adopted to drive the whole equipment, the formwork is fully hydraulic, with hydraulic cylinder to prop & strip, and lock mechanically.         Lining formwork for windbreak open

Price: Negotiable MOQ: Negotiable Delivery Time: Negotiable

Waterproof Safe Single - Side Climbing Formwork For Wall

Recycling Single Side Climbing Formwork Low Labour Cost Description: With CMAX SCB180 climbing systems, the loads from the fresh concrete pressure are transferred through the brackets by means of V-strongbacks and compression braces into the scaffold anchors. Typical applications for the SCB 180 system are dams, locks, cooling towers, pier heads, tunnels, and bank vaults. The formwork is simply tilted backwards when striking takes place. The 1.80 m wide bracket requires only

Price: Negotiable MOQ: Negotiable Delivery Time: Negotiable

Single - Side Climbing Formwork with Economical and Safe Anchoring System

Single - Side Climbing Formwork with Economical and Safe Anchoring System Recycling Single Side Climbing Formwork Low Labour Cost Description: With CMAX SCB180 climbing systems, the loads from the fresh concrete pressure are transferred through the brackets by means of V-strongbacks and compression braces into the scaffold anchors. Typical applications for the SCB 180 system are dams, locks, cooling towers, pier heads, tunnels, and bank vaults. The formwork is simply tilted

Price: Negotiable MOQ: Negotiable Delivery Time: Negotiable

High Load Bearing automatic hydraulic Tunnel Formwork System For Windbreak Open Cut Tunnel

High Load Bearing automatic hydraulic Tunnel Formwork System For Windbreak Open Cut Tunnel Detailed Product Description tunnel form work tunnel form system aluminium formwork system High Load Bearing Tunnel Formwork System For Windbreak Open Cut Tunnel Description: 1. Brief introduction The automatic hydraulic tunnel formwork is the equipment to make the concrete lining for the tunnel in one time. The motor gearbox is adopted to drive the whole equipment, the formwork is

Price: Negotiable MOQ: Negotiable Delivery Time: Negotiable

Dark Red 100 * 100 * 900mm Steel Formwork For Bridges , Tunnels , Walls , Docks , Reservoirs

Dark Red 100 * 100 * 900mm Steel Formwork For Bridges , Tunnels , Walls , Docks , Reservoirs Product detail: Steel formwork are engaged in development and manufacturing of the special type steel formwork for highways, railways, bridges, tunnels, walls, docks, reservoirs, large-scale stadiums, exhibition centers, etc. Specifications: 300 x 1,500 x 55, 300 x 1,200 x 55, 300 x 900 x 55, 300 x 600 x 55, 250 x 1,500 x 55, 250 x 1,200 x 55, 250 x 900 x 55, 250 x 600 x 55, 100 x 100

Price: Negotiable MOQ: Negotiable Delivery Time: Negotiable

Single sided formwork system , tunnel formwork for Singapore MRT project

Single sided formwork system , tunnel formwork for Singapore MRT project Descrition: Singapore MRT project, include 2 tunnels and 2 stations, the tunnel length 754 mater and 745 maters, diameter is 6.6 maters. The retaining wall for station is 6 meters. Specifications: Single-side formwork system, tunnel formwork are applied in this project. The detail is below:

Price: Negotiable MOQ: Negotiable Delivery Time: Negotiable

Orange 300 * 1 , 500 * 55 0.45㎡ Steel Formwork Systems For Highways , Railways , Bridges

Orange 300 * 1 , 500 * 55 0.45㎡ Steel Formwork Systems For Highways , Railways , Bridges Product detail: Steel formwork are engaged in development and manufacturing of the special type steel formwork for highways, railways, bridges, tunnels, walls, docks, reservoirs, large-scale stadiums, exhibition centers, etc. Specifications: 300 x 1,500 x 55, 300 x 1,200 x 55, 300 x 900 x 55, 300 x 600 x 55, 250 x 1,500 x 55, 250 x 1,200 x 55, 250 x 900 x 55, 250 x 600 x 55, 100 x 100 x 1

Price: Negotiable MOQ: Negotiable Delivery Time: Negotiable

Double Formwork Outdoor Aluminium Mobile Scaffold For Cleaning Gutters

Double Formwork Outdoor Aluminium Mobile Scaffold For Cleaning Gutters Specifications: Place of Origin: Jiangsu, China (Mainland) Brand Name: JMX FOB Price: Get Latest Price Minimum Order Quantity: 20 Ton/Tons one container Port: shanghai Packaging Details: normally it's packed in square steel pallet or in bulk. It depends on client's requirement Delivery Time: 30 days Payment Terms: L/C,T/T Supply Ability: 1000 Ton/Tons per Month Product detail: Mobile scaffold is a type of

Price: Negotiable MOQ: Negotiable Delivery Time: Negotiable
1 2