Verified Supplier
herong electric
40 Years Development, Main Professional Manufacturer and Electric EPC Company in China.
2004
Established
900~1000
Employees
$150000000-200000000
Annual Sales
Manufacturer, Trading Company
Business Type
Manufacturer, Trading Company
Business Type
China
Country
2004
Established
900~1000
Employees
150000000-200000000
Annual Sales
Top Score
View All
Hot Products
HV Power Capacitor With Insulation Level 42kV/75kV
8-10KW Portable Diesel Generator Hand Start Single Phase Diesel Generator
Waterproof Electric Wire Cable Data Communication Cable For Analog Signal
11kV High Voltage Capacitor Bank 100 Kvar-Power Capacitor
33kV 10A Dry Type Air Core Reactor
Intelligent Prepaid Electricity Meter 3 Phase Energy Meter OBIS display LCD display
JIS C 3005-2001 Electric Wire Cable Pvc Insulated Copper Wire
Composite Lightning Surge Arrester In Transformer 0.22kV~330kV
Silent 15 Kva 3 Phase Generator 3000rpm/3600rpm High Efficiency
PWBH type pole mounted low voltage reactive power automatic compensation device
High Voltage Power Factor Capacitor Bank 7.75KV 475kVar
0
High Voltage Capacitor Bank
View AllHV Power Capacitor With Insulation Level 42kV/75kV
Price: Negotiable
MOQ: 1PC
Delivery Time: 30 work days
11kV High Voltage Capacitor Bank 100 Kvar-Power Capacitor
Price: Negotiable
MOQ: 1PC
Delivery Time: 30 working days
PWBH type pole mounted low voltage reactive power automatic compensation device
Price: Negotiable
MOQ: 1PC
Delivery Time: 30-45 DAYS
High Voltage Power Factor Capacitor Bank 7.75KV 475kVar
Price: Negotiable
MOQ: 1PC
Delivery Time: 30 work days
Single Phase HV 200 Kvar Capacitor Bank For Power Factor Improvement
Price: Negotiable
MOQ: 1PC
Delivery Time: 30 work days
6KV High Voltage Power Capacitor Single Phase With SS Case
Price: Negotiable
MOQ: 1PC
Delivery Time: 30 work days
6.6kv High Voltage Shunt Capacitor With Capacity 25kVar
Price: Negotiable
MOQ: 1PC
Delivery Time: 30 work days
High Voltage Switchgear
View AllHv High Voltage Gas Insulated Switchgear Metal Armored 12kV Customized
Price: Negotiable
MOQ: 1PC
Delivery Time: 30-45 DAYS
GSS4 12kV Solid Insulated High Voltage Switchgear With Metal Enclosed HV GIS Switchgear
Price: Negotiable
MOQ: 1PC
Delivery Time: 30-45 DAYS
IP23 High Voltage Switchgear 0.4-10KV Movable Prefabricated Substation
Price: Negotiable
MOQ: 1PC
Delivery Time: 30-45 DAYS
GZS1 10KV High Voltage Switchgear Indoor Metal Clad Switchgear
Price: Negotiable
MOQ: 1PC
Delivery Time: 30-45 DAYS
High Voltage Switchgear 12kV 50Hz For Power Plants air insulated switchgear
Price: Negotiable
MOQ: 1PC
Delivery Time: 30-45 DAYS
High Voltage Disconnecting Switch
View All50Hz 60Hz High Voltage Disconnecting Switch Hv Ac Isolator Switch
Price: Negotiable
MOQ: 1PC
Delivery Time: Negotiable
High Voltage Pole Mounted Load Break Switch 12KV 24KV 33KV 4001A 600A 1250A
Price: Negotiable
MOQ: 1PC
Delivery Time: 30-45 DAYS
630A 3150A 35Kv High Voltage Isolator Switch Separation Relationship Outdoor Installation
Price: Negotiable
MOQ: 1PC
Delivery Time: 30-45 DAYS
High Voltage Disconnect Switch 12kv/24kv For Power Transformer
Price: Negotiable
MOQ: 1PC
Delivery Time: 30-45 DAYS
Outdoor AC High Voltage Disconnecting Switch Three Phase Simple Structure
Price: Negotiable
MOQ: 1PC
Delivery Time: 30-45 DAYS
Outdoor Three Column High Voltage Disconnecting Switch High Conductivity
Price: Negotiable
MOQ: 1PC
Delivery Time: 30-45 DAYS
GN22 8000A High Voltage Earthing Switch 12KV 24kv Load Break Switch
Price: Negotiable
MOQ: 1PC
Delivery Time: 30-45 DAYS
Factory Footage
View All
Company Videos
Quality Assured
View All
Certifications
ISO14001
ISO9001
ISO45001
ISO45001