Home Products Strand Jack Lifting System

Strand Jack Lifting System

Showing 11 Products

Hollow Plunger hydraulic strand jack system for Roof Lifting / Raising

Intelligent hollow plunger hydraulic Strand jack lifting system for Heavy steel structures lifting and lowering Recent years, a lots of big span and various shaped steel structure roof uses in some large building. such as railway station, stadium, hangar, large warehouse, shopping mall... it with the features of large volume, supper heavy, difficult construction. KATTOR, based on above construction method, developed the Hollow Plunger Strand Jack Lifting System. with

Price: Negotiable MOQ: 1 set (normal size) Delivery Time: 2-4 weeks

CSS Series PLC control hydraulic jack system for heavy duty lifting / moving operation

CSS Series, Strand Jack Lifting and lowering System Summary: Strand jacks system is a special hydraulic cylinder, it works with PLC controlling system and pump station together, to be a very stable system for heavy duty lifting and moving operation, For the heavy loads need to be moved through long distances or frequent work, and have a large number of lifting points, This system is the best choice, it’s widely used in construction of bridge, port, power station, ship lock,

Price: Negotiable MOQ: 1 set (normal size) Delivery Time: 4-8 weeks

Professional Strand Jack Lifting System For Heavy Objects Launching Lifting

KATTOR CSS Series, Intelligent hydraulic Strand jack lifting system for Heavy objects launching lifting and lowering Recent years,incremental launching was widely applied to bridge construction.It's an advanced self spanning construction method for pre-stressed concrete continuous beam bridge, no effects on navigation and traffic, shorten project duration and reducing construction cost. Incremental launching method is to prefabricate the superstructure segments in a casting

Price: Negotiable MOQ: 1 set (normal size) Delivery Time: 4-8 weeks

Rental Service of KATTOR Intelligent Continuous Strand Jack Lifting System (CSS)

Rental Service of KATTOR Intelligent Continuous Strand Jack Lifting System (CSS) With various and diverse engineering equipments, CEEN dedicates to providing comprehensive rental fleet to meet customers’ common and specific needs. In addition to advanced equipments, well-trained and experienced technicians are available to ensure your project succeeds. Regarding the rental-service mode, both short term and long term rentals can be provided for the customers. We have rich

Price: Negotiable MOQ: 1 set (normal size) Delivery Time: 4-8 weeks

Intelligent Continuous Strand Jack Lifting System for heavy-duty launching

Intelligent Continuous Strand Jack Lifting System for heavy-duty launching In recent years,incremental launching was widely applied to bridge construction.It's an advanced no stand and self spanning construction method for pre-stressed concrete continuous beam bridge, no effects on navigation and traffic, shorten project duration and reducing construction cost. Incremental launching method is to prefabricate the superstructure segments in a casting yard which is located

Price: Negotiable MOQ: 1 set (normal size) Delivery Time: 4-8 weeks

High Accuracy Strand jack System for Heavy-duty launching and lifting

In recent years,incremental launching was widely applied to bridge construction.It's an advanced no stand and self spanning construction method for pre-stressed concrete continuous beam bridge, no effects on navigation and traffic, shorten project duration and reducing construction cost. Incremental launching method is to prefabricate the superstructure segments in a casting yard which is located behind the bridge abutment. Each segment is assembled and connected to the

Price: Negotiable MOQ: 1 set (normal size) Delivery Time: 4-8 weeks

CSS Series, Continuous Strand Jack Lifting System

In recent years,incremental launching was widely applied to bridge construction.It's an advanced no stand and self spanning construction method for pre-stressed concrete continuous beam bridge, no effects on navigation and traffic, shorten project duration and reducing construction cost. Incremental launching method is to prefabricate the superstructure segments in a casting yard which is located behind the bridge abutment. Each segment is assembled and connected to the

Price: Negotiable MOQ: 1 set (normal size) Delivery Time: 4-8 weeks

High pressure Strand jack System prestressed construction jack for launching and lifting

High pressure Strand jack System prestressed construction jack for launching and lifting In recent years,incremental launching was widely applied to bridge construction.It's an advanced no stand and self spanning construction method for pre-stressed concrete continuous beam bridge, no effects on navigation and traffic, shorten project duration and reducing construction cost. Incremental launching method is to prefabricate the superstructure segments in a casting yard which is

Price: Negotiable MOQ: 1 set (normal size) Delivery Time: 4-8 weeks

Intelligent Hydraulic Strand Jack Lifting System For Launching Lifting

In recent years,incremental launching was widely applied to bridge construction.It's an advanced no stand and self spanning construction method for pre-stressed concrete continuous beam bridge, no effects on navigation and traffic, shorten project duration and reducing construction cost. Incremental launching method is to prefabricate the superstructure segments in a casting yard which is located behind the bridge abutment. Each segment is assembled and connected to the

Price: Negotiable MOQ: 1 set (normal size) Delivery Time: 4-8 weeks

KATTOR CSS Strand jack system prestressed construction

Recent years,incremental launching was widely applied to bridge construction.It's an advanced self spanning construction method for pre-stressed concrete continuous beam bridge, no effects on navigation and traffic, shorten project duration and reducing construction cost. Incremental launching method is to prefabricate the superstructure segments in a casting yard which is located behind the bridge abutment. Each segment is assembled and connected to the previous superstructu

Price: Negotiable MOQ: 1 set (normal size) Delivery Time: 4-8 weeks

600 Ton Strand jack system for Steel Cofferdam Lowering , 18mm wall - thickness

KATTOR Strand-jack System has been applied in the steel cofferdam lowering work of Shanghelang Railway Bridge. With designing speed of 350 km/h, Shanghang Passenger Rail Line links three cities: Hangzhou, Hefei and Shangqiu. As the key-control project of this line, Shanghehang Rail-road Bridge is a vital component of river-crossing transport network in national planning Shanghehang Railway and Wuhu city roads This bridge project is contracted by The 4th Engineering Company of

Price: Negotiable MOQ: 1 set (normal size) Delivery Time: 2~4weeks