Structural Fasteners (86)
View More5/8" Tower Pole Step with Nut Galvanized for Transmission Tower
Price: Negotiable
MOQ: 1000 PCS
Delivery Time: 30 DAYS
ASTM A394 Type 0 Hot Dip Galvanized Step Bolt with two Nuts for Tower
Price: Negotiable
MOQ: 1000 PCS
Delivery Time: 30 DAYS
1-1/2" ASTM F3125 Grade A325 Hot Dipped Galvanized Steel Structural Bolt w/A563 DH Nut & F436 Washer
Price: $0.5-$2.5
MOQ: 1,000 pcs
Delivery Time: 45 DAYS
M36 ASTM F3125M Grade A325M Hot Dipped Galvanized Steel Structural Bolt w/A563 DH Nut & F436 Washer
Price: $0.5-$2.5
MOQ: 1,000 pcs
Delivery Time: 45 DAYS
Utility Fasteners (27)
View MoreFoundation Anchor Bolts (31)
View MoreThimble Eye Galvanized Helix Earth Anchor Rod
Price: USD 3~10 Piece
MOQ: 1,000 pieces
Delivery Time: 4-6 work weeks
Building & Construction Fastener (16)
View MoreCoil Tie, Single Double Flared Coil loop Inserts for Concrete Construction
Price: USD 0.3 -3 per set
MOQ: 2,000 set
Delivery Time: 35-45 days after payment
carbon steel Coil Tie, Single Double Flared Coil loop Inserts for Concrete Construction
Price: USD 0.3 -3 per set
MOQ: 2,000 set
Delivery Time: 35-45 days after payment
HDG Coil Tie, Single Double Flared Coil loop Inserts for Concrete Construction
Price: USD 0.3 -3 per set
MOQ: 2,000 set
Delivery Time: 35-45 days after payment
Hot dip galvanized concrete forms straight coil loop insert, Concrete Coil Tie
Price: USD 0.3 -3 per set
MOQ: 2,000 set
Delivery Time: 35-45 days after payment
Transmission Fasteners (37)
View MoreLong Shark Type For Wood Crossarm Pins
Price: USD 0.5~3 Piece
MOQ: 1,000 pieces
Delivery Time: 4-6 work weeks
Short Shank-For Steel Crossarms Line Post Studs
Price: USD 8~30 Piece
MOQ: 1,000 pieces
Delivery Time: 4-6 work weeks
Long Shank-For Wood Crossarms Line Post Studs
Price: USD 8~30 Piece
MOQ: 1,000 pieces
Delivery Time: 4-6 work weeks
Wind Energy Fasteners (5)
View MoreHeavy Hexagon Nut ISO4032 For Wind Turbine Foundation Bolts
Price: USD0.35~USD0.95
MOQ: 1000 pieces
Delivery Time: 30-45 days
High Strength Heavy Washer ISO 7093-1 DIN6916 Lock Washers For Wind Industry
Price: USD0.5~USD0.95
MOQ: 1000 pieces
Delivery Time: 30-45 days
Double End Blade Studs Dacromet Grade 8.8-12.9 For Wind Energy Fasteners
Price: USD2.5~USD6.9
MOQ: 200 pieces
Delivery Time: 30-45 days
Heavy Hex High Strength Hexagonal Bolts IS4014/4017 For Wind Turbine Fasteners
Price: USD0.5~USD3.9
MOQ: 1000 pieces
Delivery Time: 30-45 days
Solar Mounting Fasteners (15)
View MoreStrut Channel Spring Nut for Solar Panel Installation
Price: USD0.1~USD0.5
MOQ: 1000 pieces
Delivery Time: 30-45 days
Hot DIP Galvanized 41X41X2.5mm Plain/Slotted Strut Channel Unistrut Channel Manufacturers And Suppliers China
Price: USD7.5~USD12.8
MOQ: 500 pieces
Delivery Time: 30-45 days
Metal Strut Channel With Slotted Back | Half-Slot Steel U-Channel
Price: USD7.5~USD12.8
MOQ: 500 pieces
Delivery Time: 30-45 days
41X21mm Strut Channel Type C With Elongated Slotted Holes HDG/Pre-Galvanized/Powder Coated
Price: USD7.5~USD12.8
MOQ: 500 pieces
Delivery Time: 30-45 days
Agriculture Fastener (138)
View MoreRed Handle Head Hitch pin with R Clip for farm Tractors and Trailers
Price: USD 1.0-10.0 PER PCS
MOQ: 1000 pcs
Delivery Time: 4 WEEKS
ANSI B18.8.1 Clevis Pin 5/8" Clevis Pins SAE J493
Price: $0.5-$1.5
MOQ: 5000 pcs
Delivery Time: 4 WEEKS
ANSI B18.8.1 Clevis Pin 1" Clevis Pins SAE J493
Price: $0.5-$1.5
MOQ: 5000 pcs
Delivery Time: 4 WEEKS
Oil & Chemical Fasteners (2)
View MoreStrut System Fasteners (73)
View MoreZinc plating Steel M8 Strut Channel Spring Nut M8 with plastic wing
Price: USD 0.2-0.5/ piece
MOQ: 10,000 pcs
Delivery Time: 35-45 days
Zinc Plated Combo Nut Washer 3/8" Combo Channel Nut Square Washer
Price: USD 0.2-0.5/ piece
MOQ: 10,000 pcs
Delivery Time: 35-45 days
Stainless Steel Strut Channel Nuts 3/8 Spring Nuts 3/8 with plastic Cover
Price: USD 0.2-0.5/ piece
MOQ: 10,000 pcs
Delivery Time: 35-45 days
1/2" Combo Nut Washer Zinc Combo Channel Nut with Square Washer
Price: USD 0.2-0.5/ piece
MOQ: 10,000 pcs
Delivery Time: 35-45 days