Home Products Shutter Roll Forming Machine

Shutter Roll Forming Machine

Showing 27 Products

Square Air Duct Shutter Roll Forming Machine , Auto Rolling Shutter Making Machine

HVAC System Fire Frame Roll forming Line production Production Forming process De-coiler—servo feeding—gap and cut off mould—forming ---collection table Equipment composing parts Equipment is composed of de-coiler ,feed system ,gap and cut off , forming machine,collection table ,electric control system , etc. Main structure and performance of machine Roll forming production scope This rollforming machine can be make the thickness from 0.8mm to 1.2mm Parameters of main

Price: Negotiable MOQ: 1 set Delivery Time: 50 days

Motorized Valves Rolling Shutter Strip Forming Machine 0.5-1.5mm Galvanized Steel

HVAC System Fire Frame Roll forming Line production 1, Production Forming process De-coiler—servo feeding—gap and cut off mould—forming ---collection table 2, Equipment composing parts Equipment is composed of de-coiler ,feed system ,gap and cut off , forming machine,collection table ,electric control system , etc. 3, Technical parameter of equipment main parts Structure and performance of machine Processing Passive De-coiler---Leveler---Servo feeder,Punching---Forming--

Price: Negotiable MOQ: 1 set Delivery Time: 50 days

GCR15 Roller Shutter Roll Forming Machine 6~8m/min Gearbox Driving Automatic

HVAC System Fire Frame Roll forming Line production Technical parameter of equipment main parts 1 - De-coiler Material width: ≤ 250 mm, Material thickness≤ 2.0mm; Inner diameter: 480-520 mm; Outer diamete: φ 1200mm; Max. Load capacity: ≤ 2T 2 - Leveling system Use 9 roller leveling, Power 2.2 kW, Speed: 10M/min 3 - Servo feeding system BNC-30Technical parameters: BNC-300 The feed shaft diameter: φ 60mm Measuring diameter of shaft: φ 60mm Maximum feed plate of width: ≤ 300mm

Price: Negotiable MOQ: 1 set Delivery Time: 50 days

Air Conditioning Ventilation Shutter Door Roll Forming Machine 34KW Vacuum Extruder

HVAC System Fire Frame Roll forming Line production 1, Production Forming process De-coiler—servo feeding—gap and cut off mould—forming ---collection table 2, Flow diagram 3, Equipment composing parts Equipment is composed of de-coiler ,feed system ,gap and cut off , forming machine,collection table ,electric control system , etc. 4, Technical parameter of equipment main parts 1 - De-coiler Material width: ≤ 250 mm, Material thickness≤ 2.0mm; Inner diameter: 480-520 mm; Outer

Price: Negotiable MOQ: 1 set Delivery Time: 50 days

Control Motor Shutter Roll Forming Machine 8-10m/min 34KW 9 Roller Leveling

HVAC System Fire Frame Roll forming Line production 1, Production Forming process De-coiler—servo feeding—gap and cut off mould—forming ---collection table 2, Flow diagram 3, Equipment composing parts Equipment is composed of de-coiler ,feed system ,gap and cut off , forming machine,collection table ,electric control system , etc. 4, Technical parameter of equipment main parts 1 - De-coiler Material width: ≤ 250 mm, Material thickness≤ 2.0mm; Inner diameter: 480-520 mm; Outer

Price: Negotiable MOQ: 1 set Delivery Time: 50 days

Air Diffuser Frame Shutter Roll Forming Machine , GCR15 Roller Shutter Forming Machine

1, Production Forming process De-coiler—servo feeding—gap and cut off mould—forming ---collection table 2, Flow diagram 3, Equipment composing parts Equipment is composed of de-coiler ,feed system ,gap and cut off , forming machine,collection table ,electric control system , etc. NO. Project Unit parameters Remark 1 Material type Mild steel Galvanized sheet Strength of material sheet Map ≥350 Thickness of material sheet mm 0.8~1.5 2 Size of production mm Reference the picture

Price: Negotiable MOQ: 1 set Delivery Time: 50 days

Gear Driving Rolling Shutter Strip Forming Machine 6~8m/min Galvanized Steel

Auto Fire Damper Shutter Frame Blade Louver Roll Forming Machine 1, Structure of equipment This line is composed of de-coiler, punching, forming machine, cutting system, electric control system, etc. 2, Equipment composing parts Equipment is composed of de-coiler, feed system, gap and cut off, forming machine, collection table, electric control system, etc. 3, Technical parameter of equipment main parts 3.1, Auto-decoiler A, Load capacity: 2 T B, Inner diameter of coil: 490

Price: Negotiable MOQ: 1 set Delivery Time: 50 days
1 2