Reliable drilling mud recycling system for horizontal directional drilling at Aipu solids control

HDD Mud Recycling System Working Procedure 1. There is a drill pit at each side of drilling hole, a set of vertical slurry pump will set on top of mud pit for feeding shale shaker. The shale shaker screen will separate drilling cuttings and discharge out, fluids part will drop into sand trap through screen hole. 2. 1 or 2 or 3 sets of desander cyclone sit after shale shaker, one set of centrifugal pump will feed desander cyclong for second phase separation, solids out of

Price: USD10000~1000000 MOQ: 1set Delivery Time: 15~40 days

Efficient drilling mud recycling system for HDD project at Aipu solids control

HDD Mud Recycling System Working Procedure 1. There is a drill pit at each side of drilling hole, a set of vertical slurry pump will set on top of mud pit for feeding shale shaker. The shale shaker screen will separate drilling cuttings and discharge out, fluids part will drop into sand trap through screen hole. 2. 1 or 2 or 3 sets of desander cyclone sit after shale shaker, one set of centrifugal pump will feed desander cyclong for second phase separation, solids out of

Price: USD10000~1000000 MOQ: 1set Delivery Time: 15~40 days

Piling/TBM/Tunnelling desanding plant at Aipu solids control for sale

Desanding Plant Working Procedure 1. A set of submersible slurry pump will pit up mud from mud pit, the length of pump under fluids normally 800mm to 1500mm. Solids particles not allowed larger than 1cm to protect pump impeller, so there is a protect mesh installed at mump inlet.2. The mud will goes into shale shaker bottom deck by a PU material shaker screen for big solids separation. There are two panel screens, 3 panels screen or 4 panels screen for the bottom deck

Price: USD10000~1000000 MOQ: 1set Delivery Time: 15~40 days

High quality professional solids control system for HDD mud process

HDD is the horizontal directional drilling. HDD mud recycling system is the drilling fluid process system similar as oil well drilling mud system. The same procedure, the 4 phases. From shaker to the centrifuge. Please find more information below. HDD Mud Recycling System Working Procedure 1. There is a drill pit at each side of drilling hole, a set of vertical slurry pump will set on top of mud pit for feeding shale shaker. The shale shaker screen will separate drilling

Price: USD20000~130000 MOQ: 1 Set Delivery Time: 20~50 days