PID regulating testing unit
PID regulating testing unit Meet the standards: IEC61215-2 MQT21 IEC62804 Product Introduction The PID power supply has multiple channel outputs, which can provide multiple components for simultaneous testing. The voltage can be continuously adjusted, and the voltage parameters can be displayed in real time. 1. The power supplies are independent of each other and can output different polarities and voltage values at the same time. 2. PID monitoring communication, and
PID regulating testing unit
Meet the standards:
IEC61215-2 MQT21
IEC62804
Product Introduction
The PID power supply has multiple channel outputs, which can provide multiple components for simultaneous testing. The voltage can be continuously adjusted, and the voltage parameters can be displayed in real time.
2. PID monitoring communication, and according to the customer's customized time requirements, the system outputs high voltage to test the tested sample on its own. The system can monitor the temperature and humidity inside the environmental test chamber according to the latest standard requirements (communicate online with high-temperature and high humidity equipment)
When the environmental testing chamber (equipped with Baishiqi environmental chamber) malfunctions, the PID power supply will automatically receive the fault information from the environmental testing chamber. The software will force the power system output to "0" to avoid damage to the test samples and ensure the safety of the equipment due to the incompatibility of the dual systems.
4. The power supply has a leakage current alarm function, and the alarm range can be set.
Main equipment parameters:
Input voltage: AC 220V ± 10%
Output voltage: DC-2000V to+2000V (continuously adjustable) can be upgraded to DC-2500V to+2500V
Voltage accuracy: 1000V 1500V 2000V continuous output, voltage fluctuation within 500 hours ≤ 0.5%
Maximum rated current: 250uA/channel
Current accuracy: 1uA+1% F · S
Test channel: Customer defined






A:We are factory in Dongguan City, Guangdong Province,China.Near Shenzhen or Guangzhou.
Q:What kind of certificate you have?
A:ISO9001 Certification, CE Certification.
Q:What is the lead time of the product?
A: Generally 7-15 days after getting the deposit.
Q:How about the payment term?
A: T/T, by cash, western union, or L/C.
Q:How about the warranty term?
A:1 year warranty,The engineer can teach the machine on the spot.