China Bored Piling Mud Recycling System 50m3/h 25μm Separation for Construction for sale
China Bored Piling Mud Recycling System 50m3/h 25μm Separation for Construction for sale
China Bored Piling Mud Recycling System 50m3/h 25μm Separation for Construction for sale

Bored Piling Mud Recycling System 50m3/h 25μm Separation for Construction

Efficiently recycles drilling mud in bored piling projects. Features shale shaker, desander, and mud cleaner for solid-liquid separation. Reduces waste, lowers costs, and ensures environmental compliance. Durable for heavy-duty use. Custom models available.

Payment Terms T/T,L/C
Brand Name TR Solids Control
Place of Origin Xi'an,China
Delivery Time 20-25work days
Model Number TRZX-50/25|TRZX-100/50|TRZX-200/50
Certification API Certificate, ISO Certificate
Product Description

Bored piling projects require efficient management of drilling fluids to ensure smooth construction, environmental compliance, and cost control. A Bored Piling Mud Recycling System is designed to handle the separation, cleaning, and reuse of drilling mud in piling operations, significantly improving efficiency and reducing waste.

Key Components of a Bored Piling Mud Recycling System

A typical system consists of:

  • Shale Shaker: Removes large solids from the drilling fluid.
  • Desander and Desilter: Separates fine sand and silt to maintain mud quality.
  • Mud Cleaner: Combines shale shaker and hydrocyclone functions for optimized solid-liquid separation.
  • Mixing and Storage Tanks: Ensures uniform mud properties and allows reuse in ongoing operations.

Benefits of Using a Mud Recycling System

  1. Cost Reduction: Reusing drilling mud reduces the need for fresh mud and lowers operational costs.
  2. Environmental Protection: Limits waste discharge, preventing soil and water pollution.
  3. Improved Drilling Efficiency: Clean mud maintains proper viscosity and density, enhancing piling performance.
  4. Durability and Reliability: Modern systems are built for continuous operation in heavy-duty construction sites.
Model     TRZX-50/25 TRZX-100/50 TRZX-200/50
Fluid Capacity      ≤50m³/h ≤100m³/h ≤200m³/h
Sludge Treatment Capacity     10~26t/h  20-50t/h 25~80t/h
Separation Point     25μm 50μm 50μm
 Shale Shaker     TRZS753 TRZS753 TRZS705
Screen Area
Upper layer:700x1250
Upper layer:750x1250
Upper layer:750x900x2
Lower layer:750x900x2 Lower layer:750x900x2 Lower layer:700x1250x3
Vibration Motor     1.0kwx2 1.0kwx2 1.5kwx2
Matching Pump     TRSB4x3-12(15kw)   TRSB5x4-13(30kw) TRSB6x5-13J(45kw)
 Cyclones     DN100x4 DN250x1 DN250x2
Tanks Dimension     2300x1830x1300mm 3100x2030x1300mm 4000x2200x1300mm
 System Dimension     2300x1830x2400mm 3100x2030x1300mm 4000x2300x2850mm

Applications in Construction Projects

  • High-rise building foundations
  • Bridge pile installations
  • Tunnel and subway piling
  • Large-scale civil engineering projects

Future Trends

The demand for sustainable construction solutions is driving innovation in mud recycling systems:

  • Automated mud monitoring and real-time control
  • Energy-efficient separation technologies
  • Modular and mobile systems for flexible deployment

By integrating advanced Bored Piling Mud Recycling Systems, construction companies can enhance operational efficiency, minimize environmental impact, and optimize project timelines.

Interested in this product?
Contact us now for more details and a custom quote.