Machinery Food & Beverage Machinery Meat Product Making Machines
China Industrial Brine Injector Machine 48-120 Needles 400-1200kg/h for Meat Processing for sale
China Industrial Brine Injector Machine 48-120 Needles 400-1200kg/h for Meat Processing for sale
China Industrial Brine Injector Machine 48-120 Needles 400-1200kg/h for Meat Processing for sale
China Industrial Brine Injector Machine 48-120 Needles 400-1200kg/h for Meat Processing for sale
China Industrial Brine Injector Machine 48-120 Needles 400-1200kg/h for Meat Processing for sale
China Industrial Brine Injector Machine 48-120 Needles 400-1200kg/h for Meat Processing for sale

Industrial Brine Injector Machine 48-120 Needles 400-1200kg/h for Meat Processing

Enhance meat flavor and moisture with our automatic brine injector. Durable, efficient, and available in 48, 80, or 120 needles with capacities up to 1200kg/h. Customizable options and CE certification ensure reliable performance for industrial use.

Packaging Details wooden package
Dimension(L*W*H) 1300*942*1820mm
Feature Easily Operate
Supply Ability 10 Set/Sets per Month
Warranty of core components 1 Year
Name Saline injection machine
Product Description
Product Description
Hot selling commercial food meat tumbler vacuum marinator marinating machine

Working principle

saline injection machine for meat is a machine used to inject a saltwater solution, or brine, into meat products such as ham,bacon, and poultry. The purpose of this process is to enhance the flavor, texture, and moisture content of the meat.
Model
Capacity
Dimension
Power
48 needles
400-700kg/h
1300*942*1820
2.6kw
80 needles
800—1000kg/h
 1300*942*1820
2.6kw
120 needles
1000-1200kg/h
1720*1050**1900
3.35kw
FAQ
Q: What methods of payment are acceptable? 
A: FOB, CFR & CIF optional; It’s mainly depend on client’s requirement; Accepted payment types: T/T, L/C;

Q: How can we guarantee the quality?

A: Always a pre-production sample before mass production; Always make a final inspection and trial running before delivery;

Q: What’s the lead time after placing order?
A: Usually it takes about 2-3 months after we received your deposit. However, it would depend on our production line schedule the timing

Q: What is the installation and training methods?
A: Our engineer will inspect and guide the installation of the equipment and the connection of the pipeline on site until the equipment is running smoothly.
Contact Us
Interested in this product?
Contact us now for more details and a custom quote.