Modular Cleanrooms Achieve 98% Material Reuse For Relocation Projects
I. Core Design Process Requirement Planning & Spatial Layout Define cleanliness class (ISO Class 3 to Class 8) and temperature/humidity precision (±0.1°C/±1% RH) Zone functional areas: personnel purification (air showers), material transfer (pass-through windows), core production zones; optimize personnel/material flows to prevent cross-contamination Reserve equipment interfaces: pre-plan equipment locations, electrical conduits, and control system wiring Structural System
Temperature
24 C–26 C in summer; 20 to 22 DEG C in win
Usage
Air Purification System,Pharmaceutical factory or laboratory,Dust Free Working for lcd glass oca laminating,Laborotory,clean requirement
Place of Origin
China
Air exchange rate
100,000-grade 10-15 times/hour
Filter Efficiency
99.99%
Packaging Details
plywood/wooden package
Product Description
I. Core Design Process
-
Requirement Planning & Spatial Layout
- Define cleanliness class (ISO Class 3 to Class 8) and temperature/humidity precision (±0.1°C/±1% RH)
- Zone functional areas: personnel purification (air showers), material transfer (pass-through windows), core production zones; optimize personnel/material flows to prevent cross-contamination
- Reserve equipment interfaces: pre-plan equipment locations, electrical conduits, and control system wiring
-
Structural System Design
- Framework Selection: Aluminum profiles (lightweight) or SUS304 stainless steel (corrosion-resistant) with electrostatic anti-dust coating
- Enclosure System:
- Walls: Powder-coated steel/stainless steel panels with sealed joints (Class 100 zones require R50mm curved corners to prevent dust accumulation)
- Viewing windows: Double-glazed tempered glass for visibility and airtightness
- Floor Treatment: Epoxy resin/PVC flooring (chemical-resistant, anti-slip); raised floor return air systems for high-cleanliness zones
-
Aerodynamic Configuration
-
Smart Control System
- 10-inch touchscreen for real-time monitoring of particle count/temperature/humidity/pressure with threshold alarms
- IoT platform for remote adjustment of HVAC/lighting/FFU speed, reducing energy consumption by 20–30% vs. traditional systems
II. Key Construction Specifications
-
Factory Prefabrication Stage
- Dust-free production of modular components (wall panels/FFUs/piping) with pre-installed electrical interfaces
- Strict QC: Air-tightness testing (≤0.01% leakage rate), material corrosion resistance verification
-
On-Site Installation Essentials
- Foundation preparation: Floor flatness tolerance ≤2mm/2m with moisture barrier
- Building-block assembly:
Non-disruptive construction: No on-site cutting permitted; 500 m² basic module assembly within 48 hours
-
Validation Standards
- Dynamic testing: Continuous 72-hour viable particle monitoring (≤1 cfu/m³ for ISO Class 5 zones)
- Airflow visualization: Smoke tests to confirm ≤0.1% dead zones
Recommended Products
Interested in this product?
Contact us now for more details and a custom quote.