Function:
widely used to soybean,pea huller.
Green bean processing machine green pea sheller Green bean processing machine green pea sheller The device runs smoothly, has a compact structure and high efficiency of shelling. The spacing of the shelling shaft can be adjusted according to the size of the edamame. The bean kernel has a high shelling rate, and the damage to the soybean kernel is extremely small, and the quality of the bean kernel is good. 1.Product Parameter Name Model Power Dimensions Output Weight Soybeans
Green bean processing machine green pea sheller

|
Name
|
Model
|
Power
|
Dimensions
|
Output
|
Weight
|
|
Soybeans Huller
|
300#
|
1.5 kw
|
800*460*650mm
|
50kg/h
|
35kg
|
|
|
400 #
|
1.5kw+0.25kw
|
950*580*800mm
|
100kg/h
|
55kg
|
|
|
500 #
|
2.2kw+0.25kw
|
1000*680*800mm
|
150kg/h
|
65kg
|
|
|
600#
|
2.2kw+0.55kw
|
1000*780*850mm
|
200kg/h
|
75kg
|
|
|
660# G
|
2.2kw+0.55kw
|
1080*800*970mm
|
250kg/h
|
75kg
|
|
|
750 #
|
2.5kw+0.55kw
|
1050*900*880mm
|
300kg/h
|
90kg
|
|
|
750#S
|
2.2kw+0.55kw+1.5kw
|
2550*900*1100mm
|
300kg/h
|
90+75kg
|
|
|
950#G
|
2.5kw+0.75kw
|
1160*1100*900mm
|
300kg/h
|
150kg
|
|
|
950# GS
|
2.2kw+0.75kw+1.5kw
|
3000*1100*1130mm
|
400kg/h
|
150+90kg
|
|
|
660#GS
|
2.2kw+0.55kw+1.5kw
|
2580*800*1100mm
|
250kg/h
|
75+75kg
|








|
Delivery Way
|
Delivery Time
|
|
By air
|
About10-20 days days after leaving the port
|
|
By sea
|
About20-30 days days after leaving the port
|