Machinery Paper Production Machinery Paper Product Making Machinery
China Automatic Paper Envelope Making Machine For Glue Coating Double Sided Adhesive for sale
China Automatic Paper Envelope Making Machine For Glue Coating Double Sided Adhesive for sale

Automatic Paper Envelope Making Machine For Glue Coating Double Sided Adhesive

EYD-996 Automatic Water Glue Double Sided Adhesive Release Paper Combining Machine Basic product info EYD-996 automatic glue coating double-sided adhesive release paper combination machine is specially used to apply glue release paper and double-sided adhesive on the envelope tongue, and has its own drying system. It adopts air-suction bottom pumping paper, blowing air to separate paper, and can continue paper without stopping the machine. Air-suction split large rollers are

Place of Origin China
Machine Weight 1500kg
Packaging Details Wooden packing
Pump Power 3.0kw
Model Number EYD-996
Supply Ability 100 sets/month
Product Description

EYD-996 Automatic Water Glue Double Sided Adhesive Release Paper Combining Machine

 

Basic product info

EYD-996 automatic glue coating double-sided adhesive release paper combination machine is specially used to apply glue release paper and double-sided adhesive on the envelope tongue, and has its own drying system. It adopts air-suction bottom pumping paper, blowing air to separate paper, and can continue paper without stopping the machine. Air-suction split large rollers are automatically stacked at high speed and stable; stepless speed change mechanism adjusts the stacking width, which is reliable and convenient; rotary glue coating ensures The amount of glue is uniform; the multi-level temperature-controlled drying device ensures that the paper is flat and dry.

 

 

Technical parameters:
Max speed 5000-11000pcs/h
Paper gram 80-157g/m 2
Max finished product size 365×280mm
Min finished product size 90×120mm
Motor power 1.5kw
Pump power 3.0kw
Machine weight 1500kg
Dimension of machine 6200×1100×1400mm
 

 

 

Our Services

1. The Seller send 2 engineers to the Buyer’s factory for Installation, Trial Running & Training. The Working duration of the 2 engineers in the Buyer’s factory will be 7 days.

2. The Buyer will pay the round airfare and will be responsible for the food, hotel and local transportation of the engineers .

3. The Buyer should offer a Chinese Interpreter for the seller’s installation engineers.

4. The Buyer should provide the Seller with required documents & help related to the entrance Visa.

5. The Seller offers one year Quality Guarantee of the machines to the Buyer.

 

Interested in this product?
Contact us now for more details and a custom quote.