Textile Fabric Oven Thermal Bonding Machine Polyester Wadding Multi Functional
Nonwoven Home Textile Multi-Functional Fabric Oven Thermal Bonding Polyester Wadding Machine Thermal bonding production line is applicable for producing a variety of products like mattress, wadding, insulation material, thick felt and etc. Some low melt fiber like PET or PP are mixed as binder. Single belt thermal-bonding oven, double-belt thermal-bonding oven Heating source: hot oil circulation, gas burner heating, diesel oil burner heating, electricity heating Installed
Nonwoven Home Textile Multi-Functional Fabric Oven Thermal Bonding Polyester Wadding Machine
Thermal bonding production line is applicable for producing a variety of products like mattress, wadding, insulation material, thick felt and etc. Some low melt fiber like PET or PP are mixed as binder.
- Single belt thermal-bonding oven, double-belt thermal-bonding oven
- Heating source: hot oil circulation, gas burner heating, diesel oil burner heating, electricity heating
- Installed power: 17.2KW(Electricity heating power according to oven width and length)
Characteristics
- Compact design for heating chamber to achieve the best heat energy utilization.
- Unique design for thermal insulation layer so as to achieve the best insulating result, reducing heat loss
- The distance between upper air channel and conveyor belt can be automatically adjusted according to the thickness of the web.
|
Raw material |
polyester fiber, waste fiber, low melt fiber, etc. |
|
Trim width |
2500mm |
|
Weight range |
400g/m2-4000g/m2 |
|
Production capacity |
1000kg/h |
|
Trade term |
FOB Shanghai |
|
Payment term |
30% T/T advance, 70% paid off before delivery. |
technical parameter
- machine width: 2600-3800mm
- chamber length: 4800-6000mm
- heating method: circulated hot oil direct burning
- Capacity :1000KG/H
|
Trade terms
|
EXW, FOB, CIF
|
|
Leading time
|
90 days
|
|
HS code
|
84490090
|
|
Payment terms
|
30% deposit, 70% paid off before loading.
|
|
Warranty
|
12 months
|
|
After-sale service
|
The seller is responsible for installation and debugging. The buyer is responsible for the round-trip airplane tickets, accommodation, medical treatment, safety and relative fees. In addition, the buyers should assign a translator, workers, electrical cable (from machines to control panel and from power to control panel), and tools for installation to cooperate with the work.
Installation cost is USD200/Day/engineer and totally installation period is about 30-35 days depending on well cooperation of the buyer. |
