Tape Paper Core Loading/Unloading Machine Pipe Drawing Machine
Paper Core Loading/Unloading Machine Tape Pipe Drawing Making Machine Feathers: Operating together with slitting machine for the loading and unloading of paper core to improve the working efficiency. Application: Movement of the cylinder controlled by hand operated valve, and equipped with precise aluminium mould to improve the efficiencyand product quality. Specifications: Model UW-L0501 UW-L1101 UW-L1310 UW-L1610 Effective width 1300mm 1100mm 1300mm 1600mm Max.Unwinding
Paper Core Loading/Unloading Machine Tape Pipe Drawing Making Machine
Feathers:
Operating together with slitting machine for the loading and unloading of paper core to improve the working efficiency.
Specifications:
| Model | UW-L0501 | UW-L1101 | UW-L1310 | UW-L1610 |
| Effective width | 1300mm | 1100mm | 1300mm | 1600mm |
| Max.Unwinding diameter | 800mm | 800mm | 800mm | 800mm |
| Unwinding diameter | 76(3")mm | 76(3")mm | 76(3")mm | 76(3")mm |
| Mechanical speed | 0-225m/mim | 0-225m/mim | 0-225m/mim | 0-225m/mim |
| Min Slitting width | 10mm | 10mm | 24mm | 24mm |
| Paper core ID | 25-76mm | 25-76mm | 76mm | 76mm |
| Max Rewinding diamter | 150mm | 150mm | 150mm | 150mm |
Matching with machines:
FAQ:
1. Are you a factory?
Yes, our company was established in 1998. It is the only comprehensive manufacturing enterprise in China produce both tape and
tape machine.
2. How could I get the quotation?
Tape: Please let me know the specification(thickness,width,length),quantity,application and other requirements according to your
needs so that we can provide an accurate quotation.
Machine: please provide the type of machine required and other special requirements.
3. Can I get some tape samples for testing before placing order?
Yes,we can provide you some free samples for your reference.
4. What is the MOQ for your tape?
5000 rolls is OK.
5. How long is the delivery time for your tape?
The first order is 15 days after deposit,then other orders are about 7-10 days after deposit.
6. How long is your warranty?
The warranty is one year.
7. How long is the delivery time for your machine?
After deposit is about 30 days.
8. What is the payment?
30% TT as deposit before production,70% TT after copy of B/L.



