Automatic Nonwoven Fabric Rolling Machine with 6000mm Width and 600m/min Speed for Bed Sheets Production
Professional embossing calender machine for nonwoven fabric finishing. Features 1600-6000mm working width, 150-600m/min speed, and CE/ISO9001 certification. Ideal for healthcare, household, and industrial applications including bed sheets, protective clothing, and filtering materials. Includes 12-month warranty and comprehensive technical support.
Professional nonwoven fabric calender machine with over 25 years of manufacturing expertise. Features advanced heating technology and high-speed operation for superior fabric finishing.
| Parameter | Specification |
|---|---|
| Roller Diameter | φ480-φ850mm |
| Working Width | 1600-6000mm |
| Maximum Speed | 150-600m/min |
| Production Capacity | 150 sets per year |
| Calender Line Pressure | 150kg/cm² |
| Certifications | CE, ISO9001 |
| Warranty | 12 months |
- High-quality alloy steel construction for durability
- Peripheral hole heating system for fast, even temperature distribution
- Multiple roller configurations: two rollers or three rollers
- Advanced drive system: one motor per roller or one motor for two rollers
- Customizable dimensions, power, and voltage options
- Healthcare: Surgical gowns, protective clothing, masks, sanitary products
- Household: Bed sheets, bedspreads, table cloths, shopping bags
- Industrial: Nursery cloth, protective cloth, filtering materials
- Construction: Wallpaper, reinforcement materials
- 12-month warranty with lifelong technical support
- Free spare parts and video technical support
- On-site installation and testing by qualified technicians
- Complete technical documentation in Chinese and English
- 24-48 hour response time for technical inquiries
Qiaode Machinery is ISO9001 and CE certified manufacturer with decades of experience in nonwoven machinery production. Our product range includes Y-type three-roller calenders, swimming rollers, slitting machines, and web-forming equipment.
We are a direct manufacturer with our own production facilities.
Minimum order quantity is 1 package.
Standard production and delivery time is 90 working days.
We accept L/C and T/T payments.