DELLOK Copper Low Finned Tubes Making Machine with 800r/min Speed and 0.01mm Precision for Heat Exchanger Production

Professional copper low finned tubes manufacturing machine with 20 years of industry experience. Features 800r/min main shaft speed, 0.01mm precision, and fin pitch range of 2.3-8.5mm. Ideal for petrochemical, power generation, and industrial heat exchanger applications with comprehensive quality assurance.

Size 3000*1000*1800mm
Packaging Details Packing with Wooden case
Fin Type L, LL, KLM
Power Supply 220V/380V/415V/440V
Fin Height 6-25mm
Minimum Order Quantity 1 set
Product Description
DELLOK Copper Low Finned Tubes Manufacturing Machine
Professional Heat Exchanger Solutions

DELLOK Young is a professional manufacturer with 20 years of experience in heat exchanger production, offering comprehensive heat transfer solutions for various industries including metallurgy, food processing, petrochemical, pharmaceutical, beverage production, wastewater treatment, and refrigeration systems.

DELLOK copper low finned tubes manufacturing machine overview
Machine Specifications
Specification Value
Mainframe dimensions 4950×900×1500mm
Connecting table size 580×900×1000mm
Working wheelbase 1000mm
Main shaft speed 800r/min
Trolley route speed 1200mm/min
Precision 0.01mm
Fin pitch range 2.3~8.5mm
Fin height range 7.5~16.5mm
Trolley aperture Φ19~Φ38 mm
Trolley stroke 1000mm/2000mm
Spindle frequency conversion motor 11KW
Trolley frequency conversion motor 3.7KW
Cooling pump motor 120W
Lubricating pump motor 180W
DELLOK copper low finned tubes machine detailed view DELLOK fin tube machine operational view
Quality Assurance & Documentation
  • Raw material certificates and Mill Test Certificate provided
  • Three-stage inspection process: raw materials, pressure testing, dimensional measurement
  • One-year warranty period from receipt of goods
  • Professional packaging with plastic mat, waterproof paper, desiccant, and protective caps
  • Export wooden cases for light/short fin tubes
  • Iron frame wooden cases for heavy/long fin tubes
Frequently Asked Questions
Are you a trading company or manufacturer?
We are a manufacturing factory and accept OEM orders. Factory visits are welcome to inspect our products and facilities.
Can I request a sample?
Yes, sample orders are available for quality testing. Mixed samples are also acceptable.
What is your production lead time?
Samples typically require 1-3 days, while mass production takes 15-30 days.

Recommended Products

Interested in this product?
Contact us now for more details and a custom quote.