Full Automatic Continuous Polyurethane Foam Machine 35m Length with 130KW Power for Mattress Production
Industrial-grade continuous polyurethane foam machine with 35m production line, 130KW power consumption, and 300kg/min maximum output. Features PLC control, 13 material tank systems, and adjustable foam dimensions from 1.0-2.25m width. Ideal for furniture foam manufacturing with comprehensive technical support.
Block cutter
Blade & Saw tooth double knife Type
Place of Origin
Guangdong, China (Mainland)
Packaging Details
foam machine Automatic continously foam making machine nude packing together with some paper and plastic film and foam sheet some small spare parts in wooden box one standard machine need 1*20GP 2*40HQ
Dimension(L*W*H)
L35m*W4m*H3m
Model Number
ZHF-2017
Raw material
polyurethane
Product Description
Full Automatic Continuous Polyurethane Foam Machine
Industrial-grade horizontal continuous foaming system for manufacturing furniture foam products including sofa cushions and mattresses. Standard configuration includes 13 raw material handling systems with comprehensive temperature control and flow monitoring capabilities.
Foaming Process Overview
- Load raw materials into temperature-controlled tanks
- Monitor and adjust material temperatures using integrated chiller system
- Verify material flow rates before production
- Conduct preliminary sample testing
- Prepare kraft paper and plastic film substrates
- Initiate automated foaming process
Technical Specifications
| Parameter | Specification |
|---|---|
| Oven Length | 18m |
| Foam Height Range | 1.0-1.25m |
| Foam Width Range | 1.0-2.25m |
| Foam Density Range | 8-200kg/m³ |
| Total Power Consumption | 130KW |
| Conveyor Belt Speed | 0-8m/min |
| Maximum Output Capacity | 100-300kg/min |
| Machine Dimensions | 35m × 4.2m × 3.2m |
Control & Operation Features
- PLC-based control system with human-machine interface
- Dual-mode operation: manual and automatic computer control
- Capable of continuous foaming with two different formulas simultaneously
- Full inverter control for synchronized production line operation
- Adjustable oven declining board height and width via control box
- Side links width adjustment through control interface
Material Tank Configuration
| Material Type | Tank Capacity | Construction | Features |
|---|---|---|---|
| PPG | 5m³ | δ5mm A3 Steel Plate | Temperature control, stirrer, filter system |
| POP | 5m³ | δ5mm A3 Steel Plate | Temperature control, stirrer, filter system |
| CaCo3 | 5m³ | δ5mm A3 Steel Plate | Temperature control, stirrer, filter system |
| TDI | 5m³ | δ5mm A3 Steel Plate | Temperature control, stirrer, filter system |
| Flame Retardant | 2m³ | δ3mm Stainless Steel | Filter system |
| MC | 2m³ | δ2mm Stainless Steel | Filter system |
Frequently Asked Questions
How many days are required for machine installation and testing?
Installation requires approximately 30 days with 1-2 engineers, followed by 15 days for electrical connection and commissioning. Total commissioning time: 45 days.
What are the costs for technical support engineers?
Engineering support costs USD40 per day per engineer, plus visa fees, round-trip airfare, and accommodation expenses.
How is technical support provided during production?
24-hour technical support available via phone and digital communication. Issues are typically addressed within 24 hours of reporting.
Machine Overview
Recommended Products
Price: US $125,000-146,700 / Sets
Interested in this product?
Contact us now for more details and a custom quote.