Automatic Round Circular Sponge Foam Cutting Machine 6-10.5m Worktable 2-150mm Thickness

Industrial-grade automatic foam cutting machine with digital control for precise polyurethane sponge processing. Features 6-10.5m diameter worktables, 2-150mm cutting thickness range, and high-efficiency production capabilities. Includes professional installation, training, and 24-hour technical support services.

Suction Can be with or without suction
Cutting foam size max W2.15xL3xH1.2m(3pcs)
Cutting blade 8940mm/10000mm/10240mm
Packaging Details Paper and Film, Wooden case
After-sales Service Provided Engineers available to service machinery overseas
Operation Automatic
Product Description
Automatic Round Circular Sponge Foam Cutting Machine
Equipment Overview

This fully automatic digital control machine processes multiple foam blocks simultaneously on a rotating worktable. Features include adjustable turning speed, precise cutting accuracy, and high production efficiency with optional vacuum equipment.

Technical Specifications
Model ZHYP-6000 ZHYP-7000 ZHYP-10000
Cutting Foam Size W1.5×L2×H1.2m (4pcs) W1.5×L2×H1.2m (5pcs) W1.5×L2×H1.2m (8pcs)
Max Foam Size W1.5×L2×H1.2m (4pcs) W2.15×L3×H1.2m (3pcs) W2.15×L4.5×H1.2m (3pcs)
Total Power 8.92kw 8.92kw 10.52kw
Worktable Speed 0-3.5r/min 0-3.0r/min 0-2.0r/min
Blade Length 8940mm 10000mm 10240mm
Worktable Diameter 6m 7m 10.5m
Cutting Thickness 2-150mm
Machine Weight 3300kg 3500kg 4500kg
External Size L6900×W6000×H2400m L7900×W7000×H2400m L11500×W6000×H2400m
Product Images
Automatic round circular sponge foam cutting machine details Industrial foam cutting machine overview Foam cutting machine operation view Sponge foam cutting machine close-up Foam cutting machine production line
Packaging & Shipping

The machine is shipped with nude packing for main components, with critical parts protected in wooden cases. Additional protection includes paper or foam sheets with plastic film wrapping to ensure safe transit while optimizing freight costs.

Foam cutting machine packaging and shipping preparation
Professional Services
  • Factory layout design consultation
  • On-site installation by 2-4 experienced engineers
  • Comprehensive operator training and maintenance guidance
  • Machine operation manual and product formulation support
Frequently Asked Questions
Q: How many days for the install and testing of the machine?
A: Installation typically requires 2 days with assistance from your team. Our engineer will ensure the machine is operational upon completion.
Q: For the cost of the engineer how much I need to pay?
A: Engineering support costs USD50 per day per engineer, plus visa fees, round-trip tickets, and accommodation expenses.
Q: What kind of raw material tools we need to prepare for the testing?
A: We provide a comprehensive tool preparation list and can assist with procurement if required.
Q: After the machine testing if we need some engineer to stay in our factory can you help to find?
A: Yes, we can help hire experienced engineers for long-term factory positions. Salary and contract details are negotiated directly.
Q: During the foaming if we have some problems about the foam and the machine how can we do?
A: Contact our after-sales manager immediately. We provide 24-hour technical support and problem resolution.
Technical Documentation

Interested in this product?
Contact us now for more details and a custom quote.