Wall Panel Double Layer Roll Forming Machine Computer Fully Automatic Control
Roof and wall panel double layer roll forming machine Technical Parameter Item NO Description Offered specification 1.1 Rolling speed UP to 16 m/min(not include cutting time) 1.2 Rolling thickness 0.21-3.0mm 1.3 Raw material Color painted coils 1.4 Dimension About 8000×1600×1200(mm) 1.5 Effective width 836mm 1.6 Feeding Coil width 1000mm 1.7 Roller stations About 18 stations 1.8 Roller material 45#forge steel, coated with chrome 1.9 Shaft diameter Φ76mm 1.10 Transmission By
Roof and wall panel double layer roll forming machine
Technical Parameter
|
Item NO |
Description |
Offered specification |
|
1.1 |
Rolling speed | UP to 16 m/min(not include cutting time) |
|
1.2 |
Rolling thickness | 0.21-3.0mm |
|
1.3 |
Raw material | Color painted coils |
|
1.4 |
Dimension | About 8000×1600×1200(mm) |
|
1.5 |
Effective width | 836mm |
|
1.6 |
Feeding Coil width | 1000mm |
|
1.7 |
Roller stations | About 18 stations |
|
1.8 |
Roller material | 45#forge steel, coated with chrome |
|
1.9 |
Shaft diameter | Φ76mm |
|
1.10 |
Transmission | By chain 1.2 inch |
| 1.11 | Material of chain | 45# forged steel with frequency quenching, 12A |
|
1.12 |
Material of cutting | Cr12Mov with quench HRC58-62° |
|
1.13 |
Tolerance | 10m+-1.5mm |
| 1.14 | Hydraulic station |
4kw |
Main Components
|
Commodity & Description |
Quantity |
|
5T manual uncoiler |
1 set |
|
Leveing guiding |
1 set |
|
Servo feeding device |
1 set |
|
Main roll forming machine |
1 set |
|
Hydraulic station |
1 set |
|
Cutting device |
1 set |
|
Finished products tabel |
1 set |
|
PLC control system |
1set |
|
Out tables |
2 sets |
|
Spare parts |
1 set |
Working Flow of Roll Forming Machine
A.Passive Decoiler..........................................................
B.Servo Feeding Applicator............................................
C.Hydraulic/Press Punching...........................................
D.Roll Forming Unit.........................................................
E.Hydraulic Cutting.........................................................
F.Output Table................................................................
Standard Profile of Product
Loading pictures
After-sale Serive
- After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
- Installation period: about 7 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)


