China Save Space 4M Lifting Height 2000Kg Loading Capacity Guide Rail Elevator for Steel Structure Workshop for sale
China Save Space 4M Lifting Height 2000Kg Loading Capacity Guide Rail Elevator for Steel Structure Workshop for sale
China Save Space 4M Lifting Height 2000Kg Loading Capacity Guide Rail Elevator for Steel Structure Workshop for sale

Save Space 4M Lifting Height 2000Kg Loading Capacity Guide Rail Elevator for Steel Structure Workshop

Save Space 4M Lifting Height 2000Kg Loading Capacity Guide Rail Elevator for Steel Structure Workshop Quick Detail: Name Guide Rail Platform Brand Name BestmaxLift Loading Capacity 2000Kg Lifting Height 4m Platform Size 2.0*2.0m Color Optional Lifting Power 3Kw Power Supply AC Product Description Hydraulic guide rail lift: Mainly used for transport goods from ground to another floor. Each floors are set button operation to achieve multi- point control. And the interaction

Place of Origin China
Vertical Travel 4000 mm
Closed Height 85 mm
Packaging Details Wrapped in pallets
Loading capacity 2000 kg
Power Voltage AC380V/50HZ
Product Description

Save Space 4M Lifting Height 2000Kg Loading Capacity Guide Rail Elevator for Steel Structure Workshop
 
 
Quick Detail:

Name Guide Rail Platform Brand Name BestmaxLift
Loading Capacity 2000Kg Lifting Height 4m
Platform Size 2.0*2.0m Color Optional
Lifting Power 3Kw Power Supply AC

 
Product Description

Hydraulic guide rail lift: Mainly used for transport goods from ground to another floor. Each floors are set button operation to achieve multi- point control. And the interaction between the upper and lower floors interlock to insure the safety when lift running.

Installation by no pit: there will have a ramp bettwen the lift platform and ground, it is easier to load&unload: 
 
Main Features:
 
1. Large loading capacity, fluctuation floor interactive interlocking.
2. High hoisting capacity, with side cylinder, durable and long lasting.
3. Only four square meters required on the over storage, no larger places required.
4. Manual lowing when power off, emergency stop button, convenient, fast and practical.
5. Can be customized according to the environment, reasonable price, economical and practical.
6. Layer door can be well versed in, workshop can be mutual split, convenient, save a space;
7. Can be installed inside and outside, special circumstances with derrick, without foundation.
8. Especially suitable for 2-3 layer steel structure workshop.

 
Configurations:

  • Electric system: Schneider contactor, SANLICO button, CHNT electrical
  • Hydraulic System: sealing
  • Platform Surface : Antiskid checkered plate
  • Platform Frame: Q345B Manganese steel and 100*40*4 rectangular tube
  • Guide Rail: 14# U Bar
  • High-pressure Oil Pip: Double wire hydraulic intensifier rubber hose

 
Applications:
 
1. Site: Work Shop, etc.
2. Aerial Working Purpose: cargo loading etc.
 
 
Why to choose CHENLIFT Guide Rail Lift?
 

· High Quality

· Reasonable Price

· Good after Service

· 1 Year Warranty

· More Than 10 Years Experience

Interested in this product?
Contact us now for more details and a custom quote.